Airiam Advanced Technologies

Progress Review & Priority Matrix

Prepared for Kuk Yi, CEO  ·  July 14, 2026
Greg Elmore · Daniel Chávez · Pedro Aquino

Project Priority Matrix

Week of July 14, 2026
SCHEDULEImportant · Not Urgent
  • Financial OperationsReady for UAT · Emitting to Sentinel · Pedro
  • The LabAndy and Ashley tested it; recommendations implemented · Ready for phased rollout · Greg
  • Operations ConsoleDesign requirements drafted · Moving from spec into build · Daniel
  • Azure Tenant MigrationNew tenant established · Resource migration plan in development · Team
  • Website Scraper (Canopy)Build progressing · Pedro
DO FIRSTUrgent + Important
  • CI/CD PipelineNight-shift pilot: overnight review & reversible drafts, held for morning approval · No autonomous merges · All
  • Cloud Naming & Tagging Standard IN USEv1.0 created and adopted across the Azure tenant · Greg / Team
  • Airiam Platform & Triage & Customer Portal IN PROGRESSMulti-company (Airiam + Canopy) · Web intake · Canopy environment provisioning next · Daniel
  • Sentinel AI (Embezzlement Module) IN VERIFICATIONAll detection tiers enabled and deployed to the dev environment · Production verification continuing · Pedro
  • Compliance Project — SOC 2 / ISO 27001 / HIPAA IN PROGRESSControl program drafted (SOC 2 / HIPAA) · Evidence collection next · Greg
BACKLOGNot Urgent · Not Important
  • Navy Federal Credit UnionTPRM Assessment
  • Financial Report CreationKuk to provide requirements
  • ATD Doc HubCentral website for what ATD is working on
  • Rinaldi CPA — AI GovernanceInbound via Jeff Elmore (CSM) · Enterprise AI + governed sandbox · Greg
DELEGATEUrgent · Not Important
  • NobleSOW for bundle of 5 and bundle of 10 – Waiting for feedback from Heidi
  • Shared SupportDaniel met with Shared Support and reviewed requirements and what can be accomplished

This Week’s Key Wins

July 14, 2026

Shared Support RAG — Leadership Tier Shipped

Daniel met with Shared Support and shipped the Leadership tier end-to-end: data model, access controls, authorization guards and the admin management UI — verified. Daniel.

Sentinel — All Detection Tiers Enabled in Dev

All detection tiers are now enabled and deployed to the dev environment, with the full pipeline passing after integration. Production verification continues. Pedro.

Olsen Palmer — Automation POC Built & Tested

License-free proof of concept for institution-profile automation: workbook-to-deck extraction, reconciliation, and an automated QC check that catches errors manual review can’t. Findings and a Phase 0 proposal are client-ready. Greg.

Design Team RAG — Accuracy Upgrade Merged to Dev

Daniel merged a grounding-and-accuracy reframe with editable prompt-memory into dev, backed by a new evaluation harness. Live-eval validation and a model refresh are in review; retrieval and long-prompt hardening continue. Daniel.

The Lab — Validated by First Tester

Andy, Art, and Ashley leveraged the Lab and Andy’s recommendations have been implemented. Ready for phased rollout; content and interface continue in parallel. Greg.

Operations Console — Requirements Drafted

Design requirements finalized for the operator “cockpit.” Moving from spec into build, with dependency health as a first-class view. Daniel.

Airiam Triage — Multi-Company

Multi-company support (Airiam + Canopy), web intake and the Canopy profile in dev. Canopy environment provisioning next. Daniel.

Canopy Screen Scraper — Build Progressing

Pedro is advancing the Canopy screen-scraper build, supporting the Canopy operations roadmap. Pedro.

ADT Three-Tiered Service Offering

Designed the three-tier ADT service offering: 1) Consultative 2) Pipeline for code deployment and monitoring 3) Governance.

AI Night Shift — Pilot Impact

July 14, 2026

Overnight Capacity — ≈3 Engineer-Days (Est.)

About 24 equivalent senior-engineering hours produced overnight in a single cycle — capacity added between shifts, not to payroll. An effort-model estimate, not a time-tracked actual.

Estimated Productivity Uplift — ≈250–300%

Across the pilot the effort model implies roughly a 250–300% uplift in equivalent output. Model-based estimates shown to size the opportunity — not measured actuals.

Defect Caught Before Integration

A genuine CI-blocking defect was isolated, reproduced, and escalated before the batch opened a pull request — avoiding downstream rework for the day team.

No Autonomous Merge or Push

Every commit routed through Tier-2 review and held for morning approval. Nothing touched a protected branch; no merge or push happened without a human decision.

Structured, Reversible Work

20 commits reviewed overnight, 7 reversible drafts prepared with targeted tests, and 11 decision tickets raised — the day team starts with decisions, not backlog.

Verification Built In

Each batch runs lint, formatting, tests, security and cross-model checks before anything is proposed. Clean subsets pass; genuine failures are gated and escalated.

How to read the numbers: productivity figures above are estimates based on the documented effort model, not time-tracked actuals. The durable signal is governance — work arrives verified, reversible, and held for accountable human approval.

Platform Roadmap

Summer 2026

NOW

Shared Support RAG — Leadership TierShipped and verified; expansion continues against new requests. Daniel.
Sentinel AI — Detection Tiers in DevAll tiers enabled and deployed to dev. Production verification next. Pedro.
CI/CD — Night ShiftDay/night loops on every commit with a bounded-autonomy tier matrix; held for approval.
Cloud Governance — Tenant & StandardsNaming & Tagging v1.0 in use; new tenant established, migration plan in development.

NEXT

Operations ConsoleMoving into build: backend selection and instrumentation, dependency-health monitoring.
Olsen Palmer — Institution Profile AutomationPOC built and tested; findings and Phase 0 proposal client-ready. Working session to scope next. Greg.
Design Team RAGAccuracy/grounding upgrade merged to dev; validation and model refresh in review. Daniel.
SOC 2 / HIPAA Evidence CollectionControl program drafted; evidence collection next.

Q3 2026

Build Safely — Service OfferingReadiness Check, Launchpad, Governed Operations. Foundation documentation drafted.
Airiam Intelligence PlatformFoundation & architecture. Design stage.
Canopy — Operations RolloutOperations dashboard · Triage rollout · Website Scraper in build.
Rinaldi CPA — AI GovernanceEnterprise AI + governed sandbox. Scoping call proposed.

Completed Projects

July 14, 2026

Noble — First Automation

Delivered and working in production. Original engagement complete and closed. Reusable for future automations. Pedro led.

Shared Support RAG

Deployed and running in production for the customer. Original engagement delivered; expansion now in build — the Leadership tier shipped this week. Daniel led.

Airiam Triage

First deployed to Shared Support and live in production: attachment upload, email and Linear routing, and observability. Multi-company expansion continues. Daniel led.

Financial Operations Platform

Accounts-payable automation delivered and complete; awaiting customer UAT. Pedro and Daniel led.